Skip to content
THRADD

Sector

Data centers

We source and quote the electrical parts that go into a data-center build, from the utility interconnect to the distribution inside the hall, and we search for the rest of the bill of materials on request.

Download the data centers line card (PDF)

Download the line card (PDF)

A data hall corridor between two rows of server cabinets, lit from above

What we source for this sector

We source and quote.

Real example items, by system. Send anything that is not listed; the search is the same.

  • Utility interconnect and substation

    • Transformer bushings
    • Current transformers
    • Gauges and relays
    • Tap-changer parts
    • Surge arresters
    • Disconnect hardware
    • Connectors and lugs

    Power and GSU transformers themselves: send the specification and we search manufacturers and second sources, then quote what we find.

  • Transformer fluids and sealing

    • FR3 natural ester fluid
    • Type II mineral oil
    • Transformer gaskets, O-rings and sealing kits
    • Transformer valves and drain plugs
  • Medium-voltage switchgear and protection

    • Fuses and fuseholders
    • In-line disconnects
    • Lightning arresters
    • Breakers and switchgear components
    • Protection relays
  • Backup power

    • Diesel and gas generator sets and parts
    • Transfer switches
    • UPS systems
    • Battery strings and monitoring
  • Distribution inside the building

    • PDUs, busway and tap boxes
    • Rack power cables and cable trays
    • Low-voltage cable
    • Connectors and lugs
    • Sleeving
    • Grounding hardware
  • Cooling, cabling and site

    • Chillers, CRAH and CRAC units
    • Pumps, valves and filters
    • Fiber and structured cabling
    • Poles, steel and fabricated parts
    • Lighting and signage

    Anything else on the bill of materials: send it and we search.

From the grid to the rack

Every point on the power path has parts we source.

Hover or tap a point on the drawing. The panel lists, in plain words, what we source and quote there.

Selected point

Utility feed

Where the utility line meets the site.

We source and quote

  • Surge arresters
  • Disconnect hardware
  • Current transformers
  • Connectors and compression lugs
  • Poles and line hardware
  • Primary cable

How a request works here

Four steps, in your words.

  1. Send the requirement

    A line from the bill of materials, a spec sheet, a one-line diagram or a nameplate photo, with quantity and the date the site needs it.

  2. We search

    Manufacturer first, then distributors and second sources. Long-lead items get a parallel search for alternates.

  3. Quote and confirm

    Price and lead time in one quote, with the standards and documentation your engineer asks for.

  4. Deliver to the site

    Freight coordinated to the laydown yard or the hall, with tracking until it lands.

Start a request for data centers.

The form opens with this sector selected. A part number, a nameplate photo or a description is enough to start.